I hope everyone has enjoyed the last week of school and all of the fun activities that go along with it. Just think---next year at this time we will be celebrating the end of the first Dry Creek school year! There continues to be progress with the building and grounds. The above picture shows the kindergarten pull through and kindergarten playground preparation.
Preparation for the sidewalks and drive through in the front of the school
Playground pit
White boards and bulletin boards are being installed in some classrooms this week. Almost all of the classrooms have been painted at this point. Cabinets are still being installed throughout the building.
White board and bulletin board along the back wall of a classroom
Tile in the classrooms by the sink and cubbies
Dry wall is being completed in the library skylight
These are the bases for the cabinets that will be installed in the faculty room
The stage area has been sheetrocked
Kitchen
Fridge and Freezer in the Kitchen
Preparation for pouring the concrete for the sidewalks
Have a fantastic summer vacation and check back often to see the progress of the school throughout the summer!