Thursday, May 29, 2014

Weekly Pictures

 I hope everyone has enjoyed the last week of school and all of the fun activities that go along with it.  Just think---next year at this time we will be celebrating the end of the first Dry Creek school year!  There continues to be progress with the building and grounds.  The above picture shows the kindergarten pull through and kindergarten playground preparation.

 Preparation for the sidewalks and drive through in the front of the school


 Playground pit


 White boards and bulletin boards are being installed in some classrooms this week.  Almost all of the classrooms have been painted at this point.  Cabinets are still being installed throughout the building.

 White board and bulletin board along the back wall of a classroom

 Tile in the classrooms by the sink and cubbies

 Dry wall is being completed in the library skylight

 These are the bases for the cabinets that will be installed in the faculty room

 The stage area has been sheetrocked

 Kitchen

 Fridge and Freezer in the Kitchen

Preparation for pouring the concrete for the sidewalks

Have a fantastic summer vacation and check back often to see the progress of the school throughout the summer!